Build a 3-bedroom house
Be the first to apply. No one has sent a proposal yet, so yours gets seen first.
Why take this job
You earn TZS 10,000 for assessing the site
Released per milestone once the client confirms the work
About the job
Build a 3-9 -bedroom house 1. House design, drawings and building permit (Architect + structural engineer, about 3–4 weeks) 2. Site clearing, setting out and foundation up to floor slab (Mason + steel fixer, about 3–4 weeks) 3. Walls, lintels and ring beam (Mason + steel fixer, about 4–5 weeks) 4. Roof structure and iron sheets (Carpenter + roofer, about 2–3 weeks) 5. Electrical wiring and plumbing pipework (rough-in) (Electrician + plumber, about 2 weeks) 6. Plastering, floor screed and septic tank (Mason, about 3–4 weeks) 7. Doors, aluminium windows and burglar bars (Carpenter + glass and aluminium installer, about 2 weeks) 8. Gypsum ceiling and floor and wall tiling (Gypsum specialist + tiler, about 3 weeks) 9. Painting, fixing sockets, lights and sanitary ware, final clean (Painter + electrician + plumber, about 2 weeks)