Kazi
Nyumba, paa, kuta, nyaya za umeme na zaidi: ona kile wataalamu wamejenga kabla ya kuwaajiri. Kazi zenye alama ya Imethibitishwa zimethibitishwa na kumbukumbu za Oweru.
Steel frame and roof structure for a 600 m² storage warehouse.
Three new shop units added on the ground floor, with steel shutters and tiled floors.
Foundation to capping, 60 metres.
Partitions, gypsum ceilings, wiring and painting for a 120 m² office.
Old iron sheets removed, timber trusses treated and new 28-gauge sheets fitted with gutters.
Wall and floor tiles in one kitchen and two bathrooms, with new skirting.
Full build from foundation to roof: blockwork, ring beam, roofing and finishing for a family of six.
Full house rewiring and a 3 kW solar system with battery backup.
Umependa unachokiona?
Weka kazi yako bure na upate makadirio kutoka kwa wataalamu kama hawa.